Yp街机电子游戏

½Ó´ýÀ´µ½Yp街机电子游戏ÍøÕ¾£¬ÎÒÃǽ߳ÏΪÄúЧÀÍ

Ä¿½ñλÖãºÊ×Ò³-×ÊѶÖÐÐÄ>ÐÐÒµÐÂÎÅÏÂÓеçÀ¾¯Ê¾´ø±ê×¼¹æ·¶

ÏÂÓеçÀ¾¯Ê¾´ø±ê×¼¹æ·¶

ȪԴ£º/ Ðû²¼Ê±¼ä£ºÈÕÆÚ£º2024-02-06 0´Î

¾¯Ê¾±ê¼Ç´ø£¬ÆÕ±éÓ¦ÓÃÓÚÖÖÖÖÖ±ÂñʽȼÆø¹ÜµÀ¡¢ÊäÓ͹ܵÀ¡¢¶¼»á¸øÅÅË®¹ÜµÀ¡¢µçÁ¦µçÀ¡¢Í¨Ñ¶¹âÀµȹØÓÚ¹ú¼ÆÃñÉúµÄµÚÎåÀàÔËÊäϵͳ¼°ÐÅÏ¢´«Êäϵͳ£¬ÌØÊâ¶ÔÖÖÖÖÇéÐÎÖØ´óµÄ¶¼»á¹ÜÍøÊ©¹¤ÖС¢õ辶ʩ¹¤ÖС¢ÐÞ½¨½¨ÉèÊ©¹¤ÖС¢Ò°ÍâÖеÄÖ±Âñ¹ÜÏßÓÐ×ÅÏÔ×ŵķÀ»¤¾¯Ê¾×÷Óã¬×èÖ¹ÒòÒâÍâËð»µÔì³ÉÖØ´óµÄ¹¤ÒµºÍ¾­¼ÃËðʧ£¬ÊÇÖÖÖÖÖ±Âñʽ¹ÜµÀ¡¢ÏßÀ·À»¤µÄ¾­¼ÃÓÐÓᢼòÆÓÒ×ÐеÄÓÃÆ·¡£

Warning signs are widely used in various directly buried gas pipelines, oil pipelines, urban water supply and drainage pipelines, power cables, communication optical cables, and other transportation systems and information transmission systems related to national economy and people's livelihood. They have a clear protective warning effect on various complex urban pipeline network construction, road construction, building construction, and directly buried pipelines in fields, To avoid significant property and economic losses caused by accidental damage, it is an economically effective and simple tool for protecting various buried pipelines and cables.

ÏÂÓеçÀ¾¯Ê¾´øµÄ·óÉè

Laying of cable warning tape below

£¨1£©×Ù¼£µçÀ¾¯Ê¾´ø·óÉèÔڹܶ¥ÉÏ·½300-500mm´¦£¨ÒÔ°ü¹ÜÊ©¹¤ÍÚ³ö×Ù¼£´øʱ£¬Î£ÏÕ²»µ½¹ÜÏߣ©£¬µ«²»µÃ·óÉèÓÚ·»ù»ò·ÃæÀï¡£

(1) The warning tape for the trace cable should be laid 300-500mm above the top of the pipe (to ensure that the trace tape does not harm the pipeline during construction), but it should not be laid in the roadbed or road surface.

£¨2£©Ö±¾¶²»´óÓÚ400mmµÄ¹ÜµÀ£¬¿ÉÔÚÉÏ·½·óÉèÒ»Ìõ×Ù¼£µçÀ¾¯Ê¾´ø £»´óÓÚ400mmµÄ¹ÜµÀ£¬Ó¦ÔڹܵÀÕýÉÏ·½Æ½ÐзóÉèÁ½Ìõˮƽ¾»¾à100-200mmµÄ×Ù¼£µçÀ¾¯Ê¾´ø¡£

(2) For pipes with a diameter not exceeding 400mm, a cable warning tape can be laid above; For pipelines larger than 400mm, two horizontal cable warning tapes with a clear distance of 100-200mm should be laid parallel above the pipeline.

£¨3£©·óÉèÀú³ÌÖУ¬Á½Ìõ×Ù¼£µçÀ¾¯Ê¾´øÅþÁ¬´¦Ó¦´î½Ó1Ã××óÓÒ£¬´î½Ó´¦½«ÂÁ²­Ò»²àµÄPEĤ°þ¿ª£¬Â¶³öÂÁ²­£¬Ê¹Á½Ìõ×Ù¼£´øµÄÂÁ²­³ä·Ö½Ó´¥£¬²¢ÓÃËÜÁϽº´ø½«´î½Ó²¿·ÖÕûÌå°ü¹üÑÏʵ£¬°ü¹ÜÕ³½ÓÀο¿£¬Í¨µçºóÄܵ¼Í¨

20230630111615766.jpg

(3) During the laying process, the connection between the two trace cable warning tapes should be overlapped by about 1 meter. At the overlap, the PE film on one side of the aluminum foil should be peeled off to expose the aluminum foil, allowing the aluminum foils of the two trace tapes to fully contact each other. The overlapping part should be tightly wrapped with plastic tape to ensure firm adhesion and conductivity after power on

£¨4£©ÔÚPE¹Ü¹Ü¶Ë£¬Èô×Ù¼£´øûÓÐÒý³öµØÃ棬ÔòÓ¦½«×Ù¼£´ø°þ¿ª50ÀåÃ׳¤£¬ÈÃÂÁ²­Óë´óµØ³ä·Ö½Ó´¥£¬ÂÁ²­Óë´óµØÐγɻØ·£¬ïÔÌ­½Ó´¥µç×裬¿ÉÒÔÌá¸ß̽²âÖÊÁ¿¡£

(4) At the end of the PE pipe, if the trace tape does not lead out of the ground, it should be peeled off 50 centimeters long to allow the aluminum foil to fully contact the ground. The aluminum foil forms a circuit with the ground, reducing contact resistance and improving detection quality.

£¨5£©·óÉèÀú³ÌÖпÉÉèÖÃÐźÅÔ´¾®£¬½«×Ù¼£´øÒý³ö£¬ÁôÔÚ¾®ÄÚ1Ã×£¬±ãÓÚ̽²âʱÓá£

(5) During the laying process, a signal source well can be set up to lead out the trace strip and leave it 1 meter inside the well for easy detection.

£¨6£©×Ù¼£´øÕûÌå¹ö»¨³ÉÐͲ¢³É¾í°²ÅÅ¡¢ÔËÊ䣬×Ù¼£´ø¿ª¾íºó»á²»Æ½Õ¹¡£Ê©¹¤Ê±£¬°Ñ×Ù¼£´ø·­¿ª4-5Ã×£¬Á½Ð¡ÎÒ˽ÈËÓÃÊÖ׽סÁ½Í·ÓÃÁ¦À­Æ½£¬ËÉÊÖºó×Ù¼£´ø±ã»áƽչ¡£È»ºóÔÙ¾ÙÐзóÉè¡£

(6) The overall embossing of the tracking tape is formed and placed in rolls for transportation. The tracking tape will not stretch out after being uncoiled. During construction, open the tracking tape 4-5 meters, and two people use their hands to grab both ends and pull them flat with force. After releasing their hands, the tracking tape will flatten. Then proceed with the laying.

£¨7£©¾Ö²¿³¬ÍÚ²¿·ÖÓ¦»ØÌʵ¡£µ±¹µµ×ÎÞµØÏÂˮʱ£¬³¬ÍÚÔÚ0.15mÒÔÄÚ£¬¿É½ÓÄÉÔ­ÍÁ»ØÌî £»³¬ÍÚÔÚ0.15,ÒÔÉÏ£¬¿É½ÓÄÉʯ»ÒÍÁ´¦Àí¡£µ±¹µµ×ÓеØÏÂË®»òË®Á¿½Ï´óʱ£¬Ó¦½ÓÄɼ¶Åäɰʯ»ò×ÔȻɰ»ØÌî±ê¸ß¡£³¬ÍÚ²¿·Ö»ØÌîºóѹʵ£¬ÆäÃÜʵ¶ÈÓ¦¿¿½üÔ­µØ»ù×ÔÈ»ÍÁµÄÃÜʵ¶È¡£

(7) Partial over excavation should be backfilled and compacted. When there is no groundwater at the bottom of the ditch, if the over excavation is within 0.15m, the original soil can be used for backfilling; If the over excavation is above 0.15, lime soil treatment can be used. When there is groundwater or a large amount of water at the bottom of the ditch, graded sand or natural sand should be used to backfill to the elevation. After backfilling the over excavated part, the compactness should be close to the compactness of the natural soil in the original foundation.

£¨8£©ÔÚʪÏÝÐÔ»ÆÍÁµØÇø£¬²»ÒËÔÚÓêÆÚÊ©¹¤£¬»òÔÚÊ©¹¤Ê±ÇÐʵɨ³ý¹µÄÚ»ýË®£¬¿ªÍÚʱӦÔÚ¹µµ×Ô¤ÁôÖµ0.03~0.06mºñµÄÍÁ²ã¾ÙÐÐѹʵ´¦Àí¡£

(8) In areas with collapsible loess, it is not advisable to carry out construction during rainy periods or to effectively drain the accumulated water in the ditch. During excavation, a soil layer with a thickness of 0.03-0.06m should be reserved at the bottom of the ditch for compaction treatment.

£¨9£©¹µµ×ÓöÓзÅÆúÐÞ½¨ÎӲʯ¡¢Ä¾Í·¡¢À¬»øµÈÔÓÎïʱ±ØÐ裬²¢Ó¦ÆÌÒ»²ãºñ¶È²»Ð¡ÓÚ0.15mÉ°ÍÁ»òËØÍÁ£¬Õûƽѹʵ¼°Éè¼Æ±ê¸ß¡£

(9) When encountering abandoned structures, hard stones, wood, garbage and other debris at the bottom of the ditch, they must be removed, and a layer of sand or plain soil with a thickness of no less than 0.15m should be laid, leveled and compacted to the design elevation.

£¨10£©²»µÃ½ÓÄɶ³ÍÁ¡¢À¬»ø¡¢Ä¾Áϼ°ÈíÐÔÎïÖÊ»ØÌî¡£¹ÜµÀÁ½²à¼°¹Ü¶¥ÒÔÉÏ0.5mÄڵĻØÌîÍÁ£¬²»µÃº¬ÓÐËéʯ¡¢×©¿éµÈÔÓÎÇÒ²»µÃ½ÓÄÉ»ÒÍÁ»ØÌî¡£¾à¹Ü¶¥0.5mÒÔÉϵĻØÌîÍÁÖеÄʯ¿é²»µÃ¶àÓÚ10%¡¢Ö±¾¶²»µÃ´óÓÚ0.1m,ÇÒÔȳÆÂþÑÜ¡£

(10) Frozen soil, garbage, wood, and soft materials shall not be used for backfilling. The backfill soil on both sides of the pipeline and within 0.5m above the top of the pipeline shall not contain debris such as crushed stones and bricks, and shall not be filled with gray soil. The number of stones in the backfill soil at a distance of more than 0.5m from the top of the pipe shall not exceed 10%, and the diameter shall not exceed 0.1m, and shall be evenly distributed.

£¨11£©»ØÌîÍÁÓ¦·Ö²ãѹʵ£¬Ã¿²ãÐéÆ̺ñ¶ÈÒËΪ0.2~0.3m£¬¹ÜµÀÁ½²à¼°¹Ü¶¥ÒÔÉÏ0.5mÄڵĻØÌîÍÁ±ØÐè½ÓÄÉÈ˹¤Ñ¹Êµ£¬¹Ü¶¥0.5mÒÔÉϵĻØÌîÍÁ¿É½ÓÄÉСÐÍ»úеѹʵ£¬Ã¿²ãÐéÆ̺ñ¶ÈÒËΪ0.25~0.4m¡£

(11) Backfill soil should be compacted in layers, with a virtual paving thickness of 0.2-0.3m for each layer. Backfill soil on both sides of the pipeline and within 0.5m above the pipe top must be manually compacted. Backfill soil above 0.5m above the pipe top can be compacted using small machinery, and the virtual paving thickness for each layer should be 0.25-0.4m.

£¨12£©ÂñÉèȼÆø¹ÜµÀµÄÑØÏßÓ¦Ò»Á¬ÆÌÉ辯ʾ´ø¡£¾¯Ê¾´øÆÌÉèÇ°Ó¦½«ÆÌÉèÃæѹʵ£¬²¢Æ½ÕûµÄÆÌÉèÔڹܵÀµÄÕýÉÏ·½£¬¾à¹Ü¶¨µÄ¾àÀëÒËΪ0.3~0.5m£¬µ«²»µÃÆÌÉèÓÚ·»ùºÍ·ÃæÄÚ¡£

(12) Warning tapes should be continuously laid along the buried gas pipelines. Before laying the warning tape, the surface should be compacted and laid flat above the pipeline. The distance from the pipeline should be 0.3-0.5 meters, but it should not be laid in the roadbed or road surface.

Ïà¹Ø²úÆ· / Related products

  • µØ¶¤

    µØ¶¤

  • µØ¶¤

    µØ¶¤

  • ¾¯Ê¾×®

    ¾¯Ê¾×®

  • ¾¯Ê¾×®

    ¾¯Ê¾×®

½ØÆÁ£¬Î¢ÐÅʶ±ð¶þάÂë

sitemap¡¢ÍøÕ¾µØͼ